What no railing on the walkway?
Theres tons of log railing everywhere but we upted to leave it out for crating and shipping purposes which kinda sucked cause it adds a cool element to the model. HOWEVER I was so behind on this thing that even little stuff like that woulda set me further back. I went the last 3 weeks straqight 7 days a week averaging 12 hour days with plenty of 14, 16 hour days as well. Everything that had to do with this project was waiting on me so the pressure was a bit much. I pulled an 18 hour day and right before I scheduled the pickup I went 22 straight hours to wrap it up. Now you can imagine the releif and feeling of freedom as it rolled out the driveway on the truck.
love it !!!!
Wow that is impressive. I am surprised I only saw Pepsi cans and one Monster can in the background! i am kinda thinking we would have seen alot of RedBull, vodka, tequila, etc bottles in the background with that kind of schedule.
lol !!! rite on dion
Nope Dion, your the only one that brings that out in me lol!
Perfect!
Thank you Ray.
Comment
© 2024 Created by Nathan Giffin Vertical Artisans. Powered by
You need to be a member of The Vertical Artisans Forum to add comments!
Join The Vertical Artisans Forum