Thanks everyone. I will answer all the questions here. The Floor was an overlay. I removed the tile and left the durarock down. The tub surround is concrete. The vanity top is granite. The floor was done in multiple steps. Self leveling, base coat, stamped sandstone, then black smooth troweled, layed in the stone, then epoxy+poly. I could have probably done about 3000 sf of floor for as long as this floor took. lol
Comment
You need to be a member of The Vertical Artisans Forum to add comments!
You need to be a member of The Vertical Artisans Forum to add comments!
Join The Vertical Artisans Forum